Sun Splash1 Click here for further information Finger W

New Electrics and Rewiring

During hull work and whilst waiting for the new mast to arrive, all of Aramis´ electrical systems were stripped out and replaced.

 

The first phase of rewiring, in 2007 included a new electrical panel, charger, dc and ac distribution cables and new instruments.

 

This included cable runs to the masthead.

 

All cables were marine grade tinned copper and cable markers were added for ease of maintenance.

 

 

The wiring was added to in subsequent phases, including relocating GPS antennas to the pushpit rail, adding a solar panel and MPPT controller and upgrading the alternator regulator and mains charger.

 

 

2007

Magwhite P1070254

The cables under the port setee berth give an idea of the many hundreds of meters of cable that had to be pulled through and connected.

Cable Marker table

AWAITING UPLOAD